View of the new bedroom, with beautiful picture window installed. You can see a little of the vaulted ceilings here.
Progress accomplished this week:
--Picture window installed in bedroom
--Skylight in kitchen installed, dry-wall repaired
--Framing done for interior of master bedroom/bathroom suite
--Stairs built in garage
--Shower unit moved to garage study
--Kitchen cabinet installed in garage study. We're re-using the old one from our kitchen renovation, although we will need to buy a new sink to satisfy the building inspector. Wagner says he can trim some of our leftover Corian countertop to fit it.
--Brickwork done on most of garage
--Foundation at front of house dug out. Turns out that we do have a footer for part of the front stretch, so we're only going to have to pay $2000 for two support piers. Phew.
--Cabinets for master bathroom selected and ordered. We're ordering AristoKraft cabinets, Landen door style, Maple wood in a saddle stain. The photo on the bottom shows the cabinet style but in a different color; the one on the top is the stain color we're going with.


Obstacles encountered this week:
--Jonathan and I changed our minds about the skylight and the furnace location. See previous post.
--Cold rain for a couple of days. This slowed/halted brickwork.
--Bathtub deemed too small and swapped out. See earlier post.
More photos, this time of the garage study: